The project occupies one floor of a ten-story building. The building owner currently implements a building-wide recycling program which includes paper, glass, plastics and metals. The LEED CI Reference Guide, Version 2.0 reguires that corrugated cardboard, in addition to the aforementioned materials, be included in the recycling program. Is it acceptable for the tenant to designate space for collection and contract with a separate materials handler for the recycling of corrugated cardboard?
Yes, this approach meets the requirements of the prerequisite. As long as the space is easily accessible and all required materials are recycled, they do not have to be processed by a single materials handler. Applicable Internationally.