This is an administrative ruling posted by USGBC updating the conditions that must be met for a project to take credit for renewable energy under EAc2.

Ruling

A previous ruling (EAc2.1 CIR Ruling 10-03-2006), defined conditions that must be met for projects to qualify for renewable energy credits under EAc2. This ruling updates the previous ruling defining alternative conditions for projects to qualify for EAc2 renewable energy credits. A project will be eligible to achieve points under EAc2 and qualify for renewable energy credits for the system under EAc1 if the project meets the following conditions: 1 The renewable energy system is installed within the boundaries of the project or on the project site. 2 The renewable energy system is connected immediately adjacent to the utility meter. 3 A 10-year (minimum) contract for on-site generation with the owner of the Energy System is established. 4 The RECs associated with the renewable energy system are not sold. 5 The Energy System owner does not count the RECs associated with the renewable energy system to meet a mandated renewable portfolio standard goal or provides the RECs to the project owner. Applicable Internationally.

Internationally Applicable
On
Campus Applicable
Off
Credits