The SRA Arlington Consolidation design development phase started in February of 2005. The owner asked that the project be designed per the LEED-CI criteria and an early analysis of the project checklist indicated a possible Silver Certification. The LEED-CI checklist was discussed at our weekly project meetings from February 2005 until May 2005, when our CD\'s were Issued for Bid on 5/13/2005. In February 2005, the current LEED-CI checklist was Version 2, which referenced the ASHRAE 90.1-2001 criteria. We continued to review the LEED-CI criteria, and completed our CD\'s as stated above utilizing the 2001 criteria. Up unitl this time, we anticipated a paper submittal to USGBC. The LEED Online website was introduced at GreenBuild in Atlanta in November 2005, however USGBC wrestled with numerous technical challenges and did not go live until the Spring of 2006. (We know this because we attempted several times to access the website to begin entering our data the early part of 2006.) The project was bid and then sat dormant until the base building progressed to a point when the interiors portion of the work could start, per the lease, in January 2006. Also, in late summer/early fall 2005 there was significant concern on the part of the interiors team that the base building was not hitting critical milestone dates, thus providing the tenant an escape clause included in the lease - effectively cancelling the construction of interiors portion of the project. Due to these delays and uncertainty, the project was not registered with USGBC until 1/26/2006. We are asking for relief or a variance from the USGBC regarding the ASHRAE 90.1 standard, specifically that due to the timing of our design phase and CD\'s (5/13/05) versus the release of LEED-CI Version 2 on 5/25/05 that we be allowed to use ASHRAE 90.1 - 2001 criteria and not ASHRAE 90.1 - 2004. Obviously, without this prerequisite we will not be able to continue completing the submittal for this project.
Projects must adhere to the requirements of the version in effect at the time of the project\'s registration. No exceptions can be made. Applicable Internationally.