The note in EA 2 references the ENERGY STAR SIP Visual Inspection Form. On that form, there is a sign-off for the SIP Manufacturer Field Representative. Who is that, and is it necessary?
According to EPA, the signature is required but it does not necessarily need to be a manufacturer representative that signs it. If there is no manufacturer field rep. on the project, then this should be signed by whomever is responsible for the proper installation of the SIPs. This may be the builder or a separate contractor. Applicable Internationally.