Date
Inquiry

For part (d), what type / level of storm must the on-site element be designed for?

Ruling

This credit is open to some discretion by the landscape professional and Green Rater. A good guideline is design the site to handle a two-year, 24-hour design storm.

Internationally Applicable
Off
Campus Applicable
Off