Date
Inquiry

See below for alternative method on illustrating regional manufactured, extracted or processed materials in LEED-CIv2.0

Ruling

In order to verify that the extraction, harvest, recovery and manufacture site is located within a 500 mile radius of the project site, project teams are required to indicate the actual mileage between the project site and the manufacturer and similarly, the distance between the project site and the extraction site for each raw material in the submittal template. ALTERNATIVELY, a statement on the manufacturer\'s letter head indicating that the point of extraction, harvest, recovery or manufacture is within 500 miles of the LEED project site, will also be accepted as part of the LEED documentation and credit submittals. Applicable Internationally.

Internationally Applicable
On
Campus Applicable
Off
Credits