The Mid-rise Guidelines for California indicate that projects should earn 1 LEED point for every 5% of the annual reference electrical load met by a renewable energy system. However, the low-rise Rating System awards 1 LEED point per 3% offset. Which is correct?

Ruling

Mid-rise projects in California should be awarded 1 LEED point for every 3% of the annual reference electrical load met by a renewable energy system.