Date
Inquiry

Should projects with nonducted forced-air systems (e.g. mini-split, PTAC) automatically be awarded EQ 6.2 for Nonducted Systems?

Ruling

No, EQ 6.2 should not be awarded automatically to projects with nonducted forced-air systems. Projects with nonducted forced-air systems may only be awarded EQ 6.2 if the requirement in section A for Return Air Flow are met.
Updated 10/1/13 for rating system applicability.

Internationally Applicable
Off
Campus Applicable
Off