Our project is a commercial office tenant improvement which occupies the 10th floor of an existing 12 story building in New York City. Our scope of work will consist primarily of an interior cosmetic refurbishing of a previously occupied space. According to LEED CI v2.0 EA Prerequisite 2 - Minimum Energy Performance, the portions of the project covered by the tenant\'s scope of work have to comply with ASHRAE 90.1-2004 or the local energy code, whichever is more stringent. It is our understanding that the base building mechanical system does not meet these requirements. Consistent with CIR\'s dated 04/23/2007 and 02/18/2008 and Rulings dated 05/16/2007 and 03/13/2008, respectively, we are seeking clarification that we are responsible only for those portions of the systems that we are modifying in our physical space and that previously installed base building systems supplying our space are exempted from the requirements of this prerequisite.
The applicant is requesting confirmation that existing base building systems, which are not included in the tenant scope of work, are exempted from consideration under the prerequisite. Yes, only portions of the building as covered by the tenant\'s scope of work are considered under this prerequisite. Applicable Internationally.