Date
Inquiry

Does reclaimed material waste have to be included in the total for the waste calculation?

Ruling

Any waste generated at the job site must be included in the job-site waste calculation; waste that is generated elsewhere, e.g., at a mill or fabrication facility, should not to be counted.
Updated 10/1/13 for rating system applicability.

Internationally Applicable
On
Campus Applicable
Off