Please clarify if "use of salvaged, refurbished, or reused materials" for % of building (construction) would include building infrastructure components, i.e. existing in-place HVAC systems or components of a system. Would these items be applicable to MR Credit 1.3, building reuse (interior)?

Ruling

Building components that are left in-place do not meet the definition of salvaged, and thus can not contribute to achieving MR Credit 3. Components that are salvaged on-site can be included in this credit calculation only in certain circumstances. Page 192 of the LEED-NC Version 2.1 Reference Guide states: "A material salvaged during a building renovation can be applied to this credit only if it can no longer serve its original function and has been reprocessed and installed for a different use. Materials that will be reinstalled to serve in their original function may be applied to MR Credit 1.3, Building Reuse. On a project site where an existing building is being demolished or deconstructed, the material that is salvaged on-site and installed in the new building can be used to comply with this credit." MR Credit 1.3 addresses "walls, flooring and ceiling systems" only. Applicable internationally.

Internationally Applicable
On
Campus Applicable
Off