Date
Inquiry

The project is an existing building that is being converted from a hospital to an office complex. A project goal is to "reuse" by keeping the structure and some of the HVAC systems, but to completely upgrade the shell, lighting, and most of the HVAC systems to achieve a "green" building. Does the building qualify as a New or Existing building when applying Energy Credit 1: Optimize Energy Performance.

Ruling

As the only part of the building fabric that is being retained is the structure, and most (>50%) of the HVAC system is being replaced, this project would need to meet the requirements for a new building. Applicable internationally.

Internationally Applicable
On
Campus Applicable
Off