Date
Inquiry

For SS 5 e-ii does a steel mesh barrier specifically need to be installed or can another appropriate physical barrier be used?

Ruling

To earn SS 5 e-ii or e-iii, projects must install a physical termite barrier system approved by local code to be effective at limiting subterranean termite infestation. If no local code exists, reference national or international codes such as ICC standard AC380 ‘Acceptance Criteria for Termite Physical Barrier Systems.’

Internationally Applicable
On
Campus Applicable
Off