Inquiry

This credit requires 6 inches of sub base. In some scenarios, project teams report that < 6 inches could be used to meet the intent of the credit. Is it acceptable if the sub-base is not 6-inches, but a soils expert can validate that the sub-base being installed can handle a 2-year 24-hour design storm?

Ruling

Yes, this part of the credit requirement can be satisfied by having a sub-base that can handle a 2-year 24-hour design storm. This must be validated by a soils expert using an Accountability Form.