Date
Inquiry

Can waste diversion rates be documented as an average recycling rate for an integrated waste management operation serving a market area as opposed to the average for a single facility?Does the USGBC offer a prescriptive method for facilities to back-up commingle recycling percentage claims? Is visual inspection of project loads an acceptable method for documenting recycling rates? When calculating recycling percentages the USGBC does not seem to have a limit on how much ADC can be claimed as a "recyclable" commodity.

Ruling

A system recycling rate is acceptable as long, as the recycling rate utilized is regulated by a local or state government authority as a closed system, in compliance with the LEED-NC 2.1 CIR dated 12/2/2005 (#3000).For project using a project specific diversion rate, visual inspection is not an acceptable method of inspection for purposes of documenting percentage of commingled waste diverted from landfill. Currently ADC is an acceptable method for compliance with this credit. ADC meets the intent of MRc2. At this time there is no limit as to how much ADC can be used to fulfill credit compliance. Applicable internationally.

Internationally Applicable
On
Campus Applicable
Off