Forum discussion

CS-v4.1 EAc5:Renewable Energy

Is this a Design or a Construction credit?

Hi,

Is this a design credit or a construction credit? Wanting to substitute v4 “Renewable energy” (a design credit) and “Green power and carbon offsets” (a construction credit) with this credit. I don’t have access to a full v4.1 project on LEED Online, is there any other way to know?

/Maria

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Fri, 06/19/2020 - 14:00

I can't find it either. My guess is it depends on how you are pursuing the credit. If using an on-site system I suppose you could submit it as a design credit. If buying RECs I suppose a construction credit. Even if it is a design credit you can always defer it to the construction review phase.

Mon, 06/22/2020 - 07:07

Marcus, that sounds logic. This project would in some sense have liked it to be reviewed now, they are going for platinum and it’s a bit dodgy to leave it until later. But on the other hand, we don’t think we’ll be able to get all information together yet for a while, they’re buying electricity from a nearby solar plant. So, it’ll probably be better to submit it in construction.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.