For Option 1, the credit requirement refers to Section 1.2-5.1.6 and Section 1.2-5.1.6.2 in 2018 FGI Guidelines for Design & Construction of Hospitals. However, there are no such sections in those guidelines. Section 1.2-5 only goes to 1.2-5.1.2. Any thoughts on this?