Forgot password?
This feature available to logged-in users only.
Forum access is included with all levels of LEEDuser membership (basic and premium).
Not a member yet? LEEDuser Premium membership gives you access to all credit tips, checklists, documentation samples, and more.
Forum discussion
NC-2009 SSc1: Site Selection
Project location: United States
March 4, 2020
Is a Category 1 Forest Conservation Easement permitted to protect the limits of disturbance between a project site and an existing wetland if the project site is 60', instead of 100', from a wetland?
LEEDuser is supported by our premium members, not by advertisers.
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.
The project site is classified as "prime farmland," but is in a developed area with buildings all around. Can I still comply with this credit?
Our project site is in what FEMA refers to as "Zone D"—an area that has possible but undetermined flood hazards, as no analysis of flood hazards have been conducted. How can we tell if we comply with this credit?
Is it possible to be exempted from the wetlands requirements under this credit if we protect or restore equivalent wetlands elsewhere?
View answers »
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.