We are dealing with a manufacturing facility that has energy intensive process loads. Is there a standard way to establish a base case for manufacturing process loads?
How does one represent energy optimization for manufacturing facility?
Forum discussion
NC-v4 EAc2:Optimize energy performance
We are dealing with a manufacturing facility that has energy intensive process loads. Is there a standard way to establish a base case for manufacturing process loads?
How does one represent energy optimization for manufacturing facility?
LEEDuser is supported by our premium members, not by advertisers.
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.