The reference guide states that "If multiple, discrete HVAC systems operate independently, the team may flush out portions of the building as work is completed in each area served by a given system". Can the flush be staged such that each residential unit with its own system can be flushed separately from corridors? As another option, could the flush be performed floor by floor? What if all corridors are served by one system?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.