I have a building that is using water source heat pumps for cooling and heating. They are connected to a 2 pipe campus source water loop that has a boiler on the heat addition pipe and a cooling tower on the heat rejection pipe. Would it be possible to follow Option 1 Path 1 (90.1-2010 Appendix G) for this with the boiler/heat addition pipe modeled as purchased HHW and the cooling tower/heat rejection pipe modeled as purchased CHW?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.