Forum discussion

CI-v4.1 EAc4:Renewable Energy

Confirmation of maximum point scoring and points table

There appears to have a discrepancy in the guide dated 04_09_2019 version. The credit scorecard shows 6 points as maximum point, but the specific section mentioned that this is a prerequisite and applies to ID+C: Commercial Interirors (1-5points).

 

Furthermore, the rating document (both clean and tracked changes version) has a different table from the guide document.

It will be good to know which document will take precedence, and which one we should apply.

3

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.