Good morning,

In the New Construction v.4 Guide, the calculation of stormwater storage volume for runoff control, does not mention the conditions before the project. I understand that the same should be considered the conditions of impermeability and permeability before, or in version 4 only the post project condition is considered? In my project it would make a big difference, since currently (pre project) there is a lot of impervious area.