NC-v4.1 LTc8:Electric Vehicles

EVSE 2%

Hi Team,

Regarding..... Install electrical vehicle supply equipment (EVSE) in 2% of all parking spaces used by the project. Does this mean that each of the 2% parking spaces have to have a dedicated EVSE or that 2% has to be covered by an ESVE? For example if the 2% comes down to 6 parking spaces; can I install 2 chargers with long enough cables to cover the 6 spots or I need to put 6 chargers, one for every spot.  I hope I explained myself.  

Andres. 

 

 

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Thu, 05/09/2019 - 19:21

Hi Andres,  All required spaces need to have EVSE access. In other words, if 6 spaces are required, would you be able to accommodate 6 EV's charging at the same time. 

Mon, 03/09/2020 - 18:53

What if you are dealing with a lot more spots let say in the thousands? You can design the parking lot to maximize usage so one charging station with dual plugs can charge 4 spots, two at a time.  Would this meet the intent?   

Mon, 08/31/2020 - 16:15

You have to have a plug available for every car in a spot.  Stations that have 2 or more plugs as part of their design could be used to service more than one space.  Include cut sheets.