NC-v4 SSc4:Rainwater management

Zero Lot line Plot and Option 2 Scenario

Hi all.

I am working on a project which falls under a zero lot line. Option 1 says everything needs to be done in the design stage and the runoff needs to be managed, which was not done in our project's case. So is there any way I can approach the credit. And when it comes to Option 2 I am not sure of the percentile that I need to take for the calculation of run-off. Again in option 2, it says continuous modelling simulation is required. Can someone help me with on how to get the continuous simulation done? 