I encountered this situation when building the energy model: the laboratory's ambient temperature control was provided by VRV, which was closed, mainly for equipment testing, and the personnel were not inside.
1. I want to confirm that the VRV should be classified as an HVAC system or process.
2. If defined as a process, we use high efficiency VRV, can I create different VRV efficiency in proposed and baseline?
3. What is the reference to the VRV efficiency standard of the baseline of the process?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
- A baseline system that covers the whole building or floors of a building depending on the area and fuel source table in 90.1 - your building saves energy by having a dedicated system for the lab rooms instead of running the main system to provide the special IAQ conditions.
- If justified to have a separate HVAC, the baseline HVAC is a code-minimum system which may be packaged HVAC if the lab area is small.
What is the most effective way to prove the benefits of heat recovery? Submit a calculation documentation or specification file. Can you provide an example?
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.