FAQs about EAp2 :

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

For a project outside the U.S., how do I determine the climate zone?

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

CHP - Baseline Case Cost

Dear Concern:-

Our Project have CHP plant (Natural Gas Generator and VAM Chiller) 

In this case we have (REB) Electricity as Backup 

In this case we have arrived the design case electricity cost as (fuel (Natural gas) cost / Electricity generation) and the cost of per unit of electricity generated via Gas generator is very low compared with  market electricity rate, for example Design case electricity cost - 0.04 USD / kWh (Unit cost = Cost of fuel consumed / Electricity generation) the baseline cost is 0.12 USD / kWh (Market electricity price) but as per CHP guidance baseline case energy cost must be a back up energy or electricity (if no backup) as per our project scenario the backup energy is Electricity only and it is cost is 3 times higher when we compared with cost of generator electricity. 

so now we have clarification in baseline case electrical cost 

  1. can we model the same electricity cost for both base case and design case
  2. can we consider the different cost for Baseline case and design case
0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Fri, 04/13/2018 - 15:04

For CHP you include the cost of the natural gas as an energy use in the proposed and the electricity is considered to be free. This assumes that all of the electricity the building uses is from the CHP. If it does not produce all then a portion of the electricity would be at market rate. If it produces more then it must be allocated to other facilities or modeled as a process load in both models. The baseline uses the market rate. 

Mon, 04/16/2018 - 05:08

Hi marcus your comment is confusing and not clear & i can't able to come to a decision from your reply so please clarify our issue The entire building is using the Electricity from CHP (Gas Generator) if no Gas available or Generator Fault we have used Electricity as backup so please answer for this case The Doubts are 1.Can we model the baseline case with Market electricity rate 2.is there any issue if we model different rates for both case ( CHP electricity rate for Design case & market electricity rate for baseline case)  

Mon, 04/16/2018 - 15:03

1. I clearly stated that you use the market rate for the baseline electricity. 2. Yes there is an issue. You do not use the CHP electric rate at all for any of the calculations. The fuel used by the CHP is gas so the consumption and cost of the gas is included in the proposed modeling results. The electric production is entered as you would an exceptional calculation so the spreadsheet or form will subtract that consumption from the modeling results.

Add new comment