Dear All:-

it our industrial project we have energy cost saving of 37.8%  can we take it as 38% to get more points because i need 15 points in energy to get correct ratings 

if i need to consider the as 37.8 % means please advise how to boost up the saving  to 38% (we have consider all the exceptional calculation and ECM

can we adjust the process machine schedule to get saving