Dear All:-
it our industrial project we have energy cost saving of 37.8% can we take it as 38% to get more points because i need 15 points in energy to get correct ratings
if i need to consider the as 37.8 % means please advise how to boost up the saving to 38% (we have consider all the exceptional calculation and ECM)
can we adjust the process machine schedule to get saving