FAQs about EAp2 :

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

DHW Flow

Hi, I'm having a hard time trying to estimate my DHW Flow in the energy model for a residential project. I already put the inputs in Table 1.4 consistent with WEp1, however, table 1.4 only shows annual consumption (kgal), eQuest input is based in flow (gpm).

I've tried to estimate it by the following equation gpm=(annual consumption/DHW Schedule minutes), the problem here is I can't find anywhere in the report the total annual consumption of water from the flow. (Already checked PV-A)

1.- Is this approach correct to estimate my input flow in order to have "consistency" with WEp1?

2.- What is a good indicator of energy cost percentage of DHW in residential buildings? Last run I did was approx 35% of energy cost. (Ilumn, process and DHW) No HVAC installed.

Thanks!

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Fri, 03/16/2018 - 17:07

1. Yes the formula is correct. 2. It depends on the climate and perhaps the culture. In our US climate zone 4/5 it is usually about 20-30% of total energy use including HVAC. Without HVAC I would think that it would be much higher than 35%.

Add new comment