Hello,

When filling out this calculator, am I to list every single item (within CSI Divisions 3-10) in the "materials" tab that was installed on this project? Or am I only including those items that are actually contributing to either the MR C3 (EPD), MR C4 (Sourcing of Raw Materials), or MR C5 (Material Ingredients) credits? Per the instruction on the excel spreadsheet, "All permanently installed building products contributing toward credit compliance are required to be included..." I just want to confirm, as I have been told various things.

Thank you,