We are designing a Hotel with the following systems:
- Vertical 2-Pipe Heat Pumps in the Guestrooms (with Central Boiler and Chiller Plant)
- Ceiling Mounted 2-Pipe Heat Pumps at Common Areas and BOH Spaces.
- Ducted Make-Up Air and Rooftop Mounted Make-Up Air Units
- Electric Heat at Stairs Wells
- LED Lighting throughout
- A Building Energy Management System will be used (Evolve system or similar)
In this type of configuration, what systems are typically included on the M & V Plan?