Skip to main content

You are currently logged in under an enterprise account

Before making a purchase, you'll need to login to your personal profile or create one now.

Home
Go to BuildingGreen.com
  • Go to BuildingGreen.com
Top navigation
  • About
  • CEUs
  • Exam Prep
  • Reports
  • FAQ
  • Pricing
  • Support
Menu user
  • Login
Home
Main navigation
  • LEED Credits
  • Forum
  • Blog
  • Tip sheets

Sign in to use the forum

Forum access is included with all levels of LEEDuser membership (basic and premium).

Log in now OR
Create a free basic membership

Not a member yet? LEEDuser Premium membership gives you access to all credit tips, checklists, documentation samples, and more.

  • Monthly premium membership (auto-renews): Get it now for $15.95/month.
  • Annual premium membership (auto-renews): Get it now for $159 /year.
  • Basic membership: Sign up for free.

Sign in to your LEEDuser account

This feature available to logged-in users only.

Log in to your account »
Sign up for a free Basic Membership »
See all forum discussions about NC-2009 SSp1
Subscribe to new posts about NC-2009 SSp1 Post a new question aboutNC-2009 SSp1
See LEEDuser’s guidance on NC-2009 SSp1»
FAQs about SSp1 :

Am I exempt from this prerequisite if I have a zero-lot-line building? What if the site work is minimal due to the scope? What about a renovation? What if the excavation and foundation work is minimal due to the construction materials I am using?

What are BMPs for steep slopes?

I have a technical question about a specific control measure and whether LEED requires it. What guidance is available?

Is there a preferred method for documentation?

What suffices as far as a date-stamped photo?

Can I still earn the prerequisite if the project started considering LEED after work began?

View answers »

Forum discussion

NC-2009 SSp1:Construction Activity Pollution Prevention

Perimeter controls for urban projects

Default Avatar
Max Zayika
LEEDuser Premium Member
2 thumbs up

November 27, 2017

What are the most widely used types of perimter sediment controls for urban projects (with existing hard site paving)? In Europe it seems to be sand bags placed around the perimeter of the site fence.  Any other suggestions would be greatly appreciated.

0
Post a reply

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.

logo-footer
Footer
  • Contact us
  • BuildingGreen
  • Jobs at BuildingGreen
  • Terms & Conditions
  • Privacy Policy

© 2025 BuildingGreen, Inc. All rights reserved except where noted.

Reseau Sociaux