We are have chosen to perform IAQ testing on a new additon, to a we are building. This is a single story addition with a 2 story lobby connecting to an existing 2 story building. This addition has its own AHU.
Should we leave our temporary building seperation in place for our testing? We don't want all the stuff from the occupied side messing with our results.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.