Forum discussion

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy

IAQ testing in a new addition

We are have chosen to perform IAQ testing on a new additon, to a we are building. This is a single story addition with a 2 story lobby connecting to an existing 2 story building. This addition has its own AHU.

Should we leave our temporary building seperation in place for our testing? We don't want all the stuff from the occupied side messing with our results. 

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.