Hi, Currently I'am working on a LEED Core & Shell mixed development project, and I have an issue on develop model regarding HVAC design. We have not received the HVAC&R design drawing in office and retails area as the design and installation of the systems are conducted by the tenants. So what is the procedure on submission at design phase?
LEEDuser Basic Member
0 thumbs up