We are working on a LEED campus project which is going to be certified with one new construction building (will be certified LEED NC 2009) and some other buildings which are not going to be certified. In this site there are two separate rooms from the main building which are used by security staff who works 24/7. They have one wash room attached to one of the security room with a WC and a shower head. My questions are; 1. As these security rooms and their wash room is located separately do we have to consider this for the FTE and water use reduction calculation for the LEED NC building? 2. For the LEED master site do we have to consider the securities for FTE and this security rooms and their wash rooms if the answer for the above question is no? Thank you