1- When performing a LCA calculation for the envelope and structure, not all materials proposed by the design team have an EPD. Therefore, we propose to substitute some materials for similar materials with an EPD to complete the LCA. Would this be acceptable?

2- Can a material with an EPD which is included in the LCA be substituted in the construction phase for a similar material without an EPD?