The V4 BD+C reference guide notes "When additional properties owned by the same entity responsible for the LEED project are contiguous to the project site and have the same or a higher lighting zone as the project, the lighting boundary may be expanded to include those properties. In these cases, it is best if a lighting master plan is developed." If the LEED project boundary is a smaller area that occurs within the interior of a larger primarily developed campus property, is is sufficient to demonstrate there is no potential for property boundary trespass from the LEED site as used to suffice in v2/v3 projects? Or does this mean photometrics must be conducted including existing (potentially unidentifiable) light fixtures outside of the LEED project boundary that are more adjacent to the property line to demonstrate there is no trespass at the actual property line for the overall campus lighting?
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Thu, 02/08/2018 - 00:31
*edited to add*
This is the LI we were hoping to employ, but it looks like they don't consider it applicable to v4...thoughts?
https://www.usgbc.org/content/li-10236