Hi all,

In LEED 2009/v3 the assumption for metered/sensor cycled duration in public lavatories was 12 seconds, per USGBC issued WEp1 "additional guidance" & the excel calculator notes. This typically could be submitted to GBCI / LEED review without issue, particularly if the scheduled lavatory fixture was clearly specified to be field programmed to use this cycle duration. Just curious, as the v4 guidance seems somewhat limited on this topic. Has anyone had issues justifying deviations / having it accepted by GBCI to use something other than the baseline 30 seconds?