FAQs about EQp1 :

We have a VAV system where single AHUs serve multiple zones. Do we need to take outside air measurements at each VAV box?

Our building has a single fan that supplies outside air to multiple AHUs. Do we need to perform outside air testing at the supply fan or at all AHUs?

What if our systems do not meet the required outside air when systems are tested at worst-case conditions?

What if after our Preliminary Review we have to revise the ventilation rate procedure calculations and find that we need to make corrections to the system in order to meet the prerequisite? Can we redo the outside air testing after making corrections? Wou

My building has 80 AHUs providing ventilation to building spaces. Do I have to do the ventilation calculations and conduct outdoor air measurements for each one?

Our system cannot provide enough outdoor air to meet ASHRAE 62.1-2010 due to design limitations. How much outdoor air must we provide to meet Case 2 instead?

The outdoor air intake for our ventilation system is not accessible, and it’s not possible to measure the outdoor airflow directly. How can we determine the outdoor airflow for this system?

How do I find whether my project is located in a non-attainment area for particulate matter or exceeds the prerequisite ozone requirements?

What happened to the IEQ Space Matrix that was available to version 2009 projects? What should I reference to determine how spaces in my building should be categorized for this prerequisite?

View answers »

Forum discussion

EBOM-v4 EQp1:Minimum indoor air quality performance

Documentation required

Our project is a 26-storey building located in Mexico City with more than 20 tenants. The HVAC consists of AHUs and VAV-boxes with recirculation at the AHU. I have several questions regarding the documentation required by this prerequisite and the requirements. We would appreciate some help: 1.Can we perform the VRP calculation including only the critical zone (meeting rooms) and disregarding other non-critical spaces? 2.Some floors do not comply with ASHRAE 62.1-2010 because small VAV-boxes were installed and do not provide the OA rates required by the calculator. Does the project fall under the Case 2? Can we comply with the prerequisite just measuring the outdoor air provided by the UMA and providing 10 cfm/person? 3.Is tenant ductwork a required documentation for certification? Many false ceilings are inaccesible and the plans cannot be drawn up. 4.Natural ventilation is no longer accepted as the only means of ventilation. Does it also apply to bathrooms? Does a naturally ventilated bathroom need an exhaust fan? Thank you!

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Thu, 08/31/2017 - 23:58

Hi Gustavo, Some thoughts on your questions. 1. You don't have to enter all zones for any given system so you could just enter in the critical zone. But, the calculations have to address the total floor area and total occupants served by the system. 2. You'd have to demonstrate that your system can't be adjusted to meet the ASHRAE required flows. If the limiting factor is the VAV box, then you'd have to show that it's not technically possible to adjust it to comply. Then you could show compliance by measuring at least 10 cfm per person at the AHU. 3. Tenant ductwork is not a required submission for existing buildings projects. 4. Unless the openings are permanently open, I'd assume you'd need to meet the minimum exhaust rates from Table 6-4 of the standard. If they are permanently open you could show compliance via the natural ventilation procedure.