FAQs about EAp2 :

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

For a project outside the U.S., how do I determine the climate zone?

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

Which ASHRAE & LEED should I base my simulation on?

Hello, I have a problem with choosing a basis for my simulation. I have a building that was designed in 2015 and is about to be build. I need to perform simulations for "Optimize Energy performance" credit... In LEED 2009 it's said the baseline building should be prepared according to Appendix G Standard 90.1-2007. But there were later also versions 90.1-2010 and 90.1-2013 (The building was designed in 2015!) Should I then follow direct instructions in manual and prepare baseline model according to 90.1-2007 or rather 90.1-2013, because this is the most appropriate for my building? Please let me know, in case contact via my mail olafdybinski@gmail.com I would be very thankful for your answers. Best regards, Olaf

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Wed, 01/11/2017 - 15:41

The baseline is determined by the version of LEED you register under, not the local code or the year it was designed. If the project is registered under LEED 2009 then you use 90.1-2007. You can also use 90.1-2010 and there is a alternative point threshold if you do so published in a LEED Interpretation. If registered under LEED v4 you use 90.1-2010. I have not yet seen anything about using 90.1-2013.

Thu, 01/12/2017 - 08:04

Thank you very much Marcus!

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.