Hi all,
I am working on a project located close to the Bay. Our site will have bioretention ponds, rain gardens, etc., but for the stormwater not infiltrated on site, it will redirect to campus retention and drain directly to the bay. How can we qualify for this credit? Is directing drainage to the bay enough, or does the water have to be treated in some way (similar to SSc6.2 v3 quality control)? Thank you.
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Go premium for
Michael DeVuono
Regional Stormwater LeaderArcadis North America
LEEDuser Expert
187 thumbs up
November 14, 2016 - 2:13 pm
If you are doing Option 1, I can't think of a way you'd meet this credit while discharging anything from the design storm, regardless of location.
Option 2, you are only managing the delta Pre vs Post, and could conceivably let some go. As long as your required volume under this option is treated on-site, I can't see an objection to your scenario.