FAQs about EAp2 :

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

For a project outside the U.S., how do I determine the climate zone?

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

Walk-in coolers and freezers

I am modeling a 35,000 sf cafeteria that has seven walk-in coolers/freezers with total floor area of about 1700 sf. They are in the basement and first floor of the building. In Energy Plus, the refrigeration model accounts for the energy load on adjacent spaces and recognizes the impact of door openings, air exchange with adjacent spaces, condenser location, and heat exchange through the walls of the unit with the adjacent spaces. It also will model condenser heat recover, which is a feature that will be included in the Proposed Design. However, it is my understanding that there is no requirement (in Energy Plus or ASHRAE 90.1) to model the walk-in boxes physically, meaning they do not have to be represented as spaces in the model. But they occupy space within the building and I think the floor area they occupy should be physically modeled and designated as unconditioned space, with no ventilation required and the walls, floor, and ceiling areas set as adiabatic. But, one of the freezers is in a section of the basement next to three underground exterior walls. This makes me not as sure about making the wall adiabatic. Since walk-in coolers and freezers are process loads, so I would assume that the interior lighting is considered process load as well. The walk-in floor area would be excluded from calculating the baseline lighting power density allowance. Are my assumptions correct? Comments, corrections, and guidance are most appreciated!

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Wed, 11/02/2016 - 19:56

You are allowed to model these kinds of things different ways as long as you can demonstrate that the way you are modeling it is thermodynamicly the same as the actual condition. So you are not required to model it in place but you are required to demonstrate that your modeling method accounts for all the effects of modeling it in place. Sounds like you have some doubts about that and I agree. I don't think the lighting is process. I think these are storage spaces.

Tue, 02/13/2024 - 14:03

Hi, I am dealing with a similar issue. I have an energy model for LEED v4 compliance with ASHRAE 90.1 2010 and I can't find any guidelines/requirements about how to model cold rooms. Is there any guideline/recommendation about how to address this? Thanks

Tue, 02/13/2024 - 15:05

Walk in coolers like in the example above or more like a refrigerated warehouse? For a refrigerated warehouse here is a guide - chrome-extension://efaidnbmnnnibpcajpcglclefindmkaj/https://www.gcca.org/legacy-system/protected-docs/protdocs/EnergyGuidelines_2013-12-19.pdf

Tue, 02/13/2024 - 15:06

Walk in coolers like in the example above or more like a refrigerated warehouse? For a refrigerated warehouse here is a guide - chrome-extension://efaidnbmnnnibpcajpcglclefindmkaj/https://www.gcca.org/legacy-system/protected-docs/protdocs/EnergyGuidelines_2013-12-19.pdf

Tue, 02/13/2024 - 15:20

Walk in coolers like in the example above or more like a refrigerated warehouse? For a refrigerated warehouse here is a guide - chrome-extension://efaidnbmnnnibpcajpcglclefindmkaj/https://www.gcca.org/legacy-system/protected-docs/protdocs/EnergyGuidelines_2013-12-19.pdf