Does the cold water feed to tenant spaces need to be metered for this credit. Cold water consumption does not feature in the energy model.
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Nope
Thanks Marcus. As a follow on question if a CI Project has no water meters installed as a result of a previous Core and Shell project could we run into difficultly in terms of CI PLF 1 - Minimum Project Requirements - MPR 6. At the minute our LEED scope is Core & Shell only however I need to ensure that future tenants are not restricted should they wish to achieve CI certification themselves. We don't wish to install water meters for every tenant space if not required by LEED. I would value your expert opinion.
See the special exception to this MPR for certain projects in the Supplimental Guidance to the MPRs - http://www.usgbc.org/resources/leed-2009-mpr-supplemental-guidance-revision-2-september-2011
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.