Hi.
In option 3 of this credit “Building and Material Reuse” we must reuse or salvage building materials from off site or on site as a percentage of the surface area. Does the reuse of building aggregates (from demolished walls, floors, etc) as landfill on the same project parking lot contributes towards the credit?
Thanks