FAQs about EAp2 :

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

For a project outside the U.S., how do I determine the climate zone?

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

Baseline HVAC system modeling

Hi, I have a 14 story office building (6 below ground and 8 above). The above grade floors are offices and the below grade floors are mostly parking garages and (for simplification purposes) for activities other than office. However, the above ground floors are divided in two towers and the towers themselves do not connect with each other. 1_ (for above grade floors only) As per ASHRAE 90.1 - 2007 G3.1.1, I am supose to model each floor with an HVAC system 8 (eletric only). Does this mean that I have to model a system 8 for each floor of each tower? Or may I join the towers' floors? (for example, joining in the same HVAC system 8 both towers' 6th floor?) I do not know if I was clear enough in this matter. Thank you in advance!

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Tue, 08/30/2016 - 15:43

If they are not connected I think they should be treated as separate floors. So a system 8 for each floor for each tower makes sense to me.

Tue, 08/30/2016 - 16:07

If they are not connected other than with underground parking, shouldn't they be considered as two separate buildings and therefore be certified separately?

Tue, 08/30/2016 - 16:14

Since the buildings are connected they can be considered one project for LEED. Check out the MPRs for more details on separate certifications and when they are required.

Tue, 08/30/2016 - 16:33

Yes, but according to the 'Supplemental guidance to the MPRs' they should be connected by gross floor other than parking. "Defining ‘one building’... "Such super-structures may... be considered a single building if ...a)Space that can be included in the gross floor area of the project that serves a purpose other than parking or the circulation of people is contiguous throughout the structure."

Tue, 08/30/2016 - 16:46

Yes I made some assumptions but ultimately we do not have enough information to make this MPR determination so I answered the specific issue that was questioned assuming it was one LEED submission. Could it be more than one, yes of course it could. The original post referenced some spaces other than parking below grade so it is hard to say for sure.

Tue, 08/30/2016 - 17:20

Yes, as I mentioned before, there are underground floors that are mostly occupied spaces and the project should indeed be only one. Thank you for your quick responses Marcus and Santiago!

Add new comment