FAQs about EAp2 :

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

For a project outside the U.S., how do I determine the climate zone?

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

Denied EAp2

After two rounds of review our model was denied because according to the reviewer’s comment it still “it remains unclear whether the energy savings modeled for space heating are justified”. The project claims a reduction in heating energy by 95%. However, we did address all comments of the preliminary review and additionally the issues described as outstanding in the final design review do not seem substantiated. The comments at the final review do not indicate particular errors in the process but only generic comments with some of them having being totally misinterpreted by the reviewer. Moreover, after having used a similar approach to various other projects we are trying to understand what would be the best approach to resolve this issue. Would it be possible to speak directly to the reviewer?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Thu, 08/18/2016 - 14:45

I'm sorry to hear that. The formal way to contact the reviewer is thought a CIR, where you could argue with greater detail how you modelled it and why you think your models are correct. There use to be an informal way of contacting the reviewer thought email. I remember a link to it in the old interface. I could't find it thought. Maybe somebody else knows if this is still an option. Good luck!

Fri, 08/19/2016 - 15:00

The way to contact the the reviewer and set up a call to discuss the issues it through the Contact page on USGBC's web site - http://www.usgbc.org/contactus - click on certification question and fill out the form. CIRs are used during the process of pursuing LEED certification to seek clarity on something you wish to do ahead of submitting your documentation.

Fri, 08/19/2016 - 15:04

Good to know. Can you not submit a CIR if you are planning to appeal the credit?

Fri, 08/19/2016 - 15:54

This may be semantics. A CIR is used before submitting. A project team inquiry is used after submitting to seek clarifications.

Thu, 08/25/2016 - 15:42

This 'heating savings is not justified' must be the latest kick they are on because they just did the same thing to one of mine and the savings are absolutely justified as I explained in about 50 different ways at the 2nd round review. The last trend I recall was justify your envelope or show that the software does the fan calculations correctly.