FAQs about EAp2 :

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

EAc1 Credits Using DES Option 1 + A lot of Renewables

We have a project opting to maximize the 19points of EAc1. The project is served by a District Cooling Plant. If the project will only use the Option 1 of DES Guideline which limits the project energy points to 10, can we still get all the 19 points by providing Solar PVs and Solar Thermal Panels to bring down the energy demand and consumption apart from the DES 10 point contribution? What if we push the project to Net Zero, How will the DES Guideline be followed if it restricts the Option 1 (Downstream Only) to 10 points? Ref: Treatment of District or Campus Thermal Energy for LEED V2 and LEED 2009 - Design and Construction, Table 1 - Page 10 How about the approach of this strategy if we use LEED V4? Thank you in advance.

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Tue, 08/16/2016 - 16:18

The DES is not clear on this issue. So I would advise that you skip the DES altogether and apply 90.1-2007 Addendum ai. There are some differences. This gets around the point cap issue and will allow you to earn all 19 points. If applying ASHRAE 90.1 2007 addendum ai, refer to ASHRAE 90.1 2007 addendum ai, Sections G3.1.1.1.1 through G3.1.3.10, for heating and cooling energy requirements. Any ASHRAE 90.1 2007 addenda implemented must be applied in whole and consistently among all LEED credits and prerequisites and the submittal documentation must clearly indicate any addenda that have been applied to the project documentation.

Add new comment