FAQs about EAp2 :

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

For a project outside the U.S., how do I determine the climate zone?

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

Renewable energy - EAc1

I have modeled a proposed building including PV and solar thermal systems. The energy generated of PV system is excluded of End Uses results, but the energy generateds of Solar thermal is integrated in DHW system and it is subtracted of DHW energy consumption. So, I include only PV energy generated in Table L-1 of LEED Template, i don´t include the energy generated by Solar Thermal. However i include PV and Solar thermal energy in LEED Templated of EAc2. Is the right approach? Secondly, the reviewer request me to justify calculations of renewable energy generation. The calculations are based in Energy simulation results (Energy Plus). My answer must be that renewable generation is based on Energy Simulation? and inform you thet see the results of renewable energy generated in Annual Building Utility Performance Summary (Energy Plus)? Is the right approach? Thanks!!

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Thu, 07/21/2016 - 21:09

That will probably work. Technically you should include both the solar thermal and PV in the renewable energy table on the form. If the only savings for service hot water is the solar system then it should be straight forward and not necessary to enter the savings in Table L-1. However, if you have any additional service hot water savings, like hot water demand reduction or back up system efficiency, then it is helpful to the reviewer to separate these so they can see the amount of savings associated with each. I would include a narrative explaining the breakdown of the savings if it is more than just the solar thermal system. You should provide additional information on how the savings were calculated. If generated by the modeling software provide reports showing the inputs (could be screen captures) and outputs along with an explanation of the calculations.

Fri, 07/22/2016 - 07:24

ThankS Marcus. I´m sorry for posting the same question in different forum. i was handling mobile device and the question don´t displayed as posted. Sorry. I point option "Automatic Cost Calculation: Renewable energy cost savings will be based on the "virtual" energy rate defined in Section 1.5." on SECTION 1.8 - ON-SITE RENEWABLE ENERGY of the LEED Template. So, the renewable energy generated is subtracted of Facility Energy consumption. If I included the solar thermal energy in Table L-1, this salved energy is count twice. Therefore I think that i have to include only PV energy in Table L-1. Is the right approach? Secondly, to included the total energy consumption of the Proposed building in EAc2 LEED Template, I have to add the Solar thermal energy generated to End use result of Energy Plus? Because the End use of simulation result include the saving of Soler thermal Energy. Thanks in advanced!!!

Sat, 07/23/2016 - 17:14

That approach should work just make sure to explain to the reviewer that the solar thermal is included in the Proposed modeling results. You are correct that you do not want to count it twice.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.