Dear All we have model the factory project with 50% A/c and 50% Ventilation and the fresh air is supplied by ERV, HRW, Treated fresh air units to A/c areas but the ERV, HRW, Treated fresh air units are not interlocked with A/c system and the power consumption is about 150 kw (ERV, HRW, Treated Fresh air units) So How I model this 150kW (In proposed case we take a advantage of these three in Cooing energy) In base case we did not take any advantage due to these three in cooling Now the ISSUE is if we consider equivalent air flow fans for base case it is just 50 kW only so can I take 50 kW for base case