Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

For a project outside the U.S., how do I determine the climate zone?

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

Energy Modeling

Hi Marcus, I am doing energy modeling for a project.i have questions regarding the occupancy and building exposure.please comments on following. 1. Occupancy is use in model for simulation peak or normal, normal means,"one office is for general manager, at a particular time its maximum occupancy is 5 other then the only manager is occupy. Which option i use peak occupancy or normal for Energy simulation. 2. I am using only exposed wall in model for all spaces.if there no exposed wall i,m not using exposure.I,m not using partition wall for any space.Is it correct or not,?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Thu, 06/09/2016 - 15:02

1. It depends on how often the space is at peak occupancy. If that happens everyday for an hour or more they you would account for it. So most of the time for occupancy you use the peak occupancy and then develop a schedule with a diversity (some percentage of the peak) for each hour. 2. I am not sure I understand the question. Are asking should you model interior partition walls?

Fri, 06/10/2016 - 05:43

Thank you Marcus, yes i am asking about interior partition walls.

Fri, 06/10/2016 - 17:31

Yes you generally do not model interior partition walls. As such there is often a difference between the gross square footage of the building the net square footage in the model. Usually the difference is no greater than 10%. The "partition" included in the model is usually just a line between zones. Most of the time the line between zones is adiabatic (no heat flow). So yes you generally do not explicitly model interior partition walls.

Sun, 06/12/2016 - 15:15

Sounds good! Thank you Marcus